The plant — our strongest asset.
A dedicated plant being built to take an enclosure from steel to finished product under one roof, with robotic welding, a C5M paint booth and precision pneumatic jigs.
From coil to dispatch.
Twelve controlled stages, from incoming steel coil to customer inspection and dispatch.
Decoiling
Steel coil is received to specification and unwound into flat sheet, traceable by heat number.
Slitting and cutting
Coil is slit and cut to the exact sizes required for each part of the container.
Sheet blasting and primer
Sheet is blasted and primed to 25 µm, the primer thickness limit that still allows clean welding.
Shearing, notching and forming
Shearing, notching and press brakes form the sheet into the finished components.
Sub-assembly
Every weldment is held in a fixture, so dimensional accuracy is maintained from the first sub-assembly.
Main assembly
The complete enclosure is welded in fixtures, with robotics at every station where it is feasible. Procedures developed to EN 1090 / ISO 3834.
Blasting
The assembled enclosure is blasted to the surface standard the coating system requires.
Auto painting
The ISO 12944 C5M coating system, applied and oven-cured in a dedicated booth.
CSC testing
Structural and water-ingress testing before the enclosure leaves the line. ISO 1496-1 type approval in progress.
Fit-out
Internal systems and fittings installed to the customer’s specification.
Customer inspection
Your team inspects and signs off the finished unit at our works.
Dispatch
Final documentation, packing and loading for transport.
What the line is built around.
The line, by function — from incoming steel through to the C5M paint and bake line.

Sheet & plate intake
Cut sheet and plate for structural and cladding steel, received to specification and traceable by heat number.
Shearing
Precision length and width cutting ahead of forming.
Press brakes
Structural forming for panels, frames and brackets.
Shot blast + 25 µm primer
Surface preparation and primer coat ahead of fabrication.
Roof press & corrugation
Structural roof forming for transport and stacking loads.
Robotic & semi-automated weld cells
Repeatable structural welding, with procedures engineered to EN 1090 / ISO 3834.
Blast / paint / oven-bake line
The ISO 12944 C5M coating system, applied and cured in a dedicated booth.
Structural test & water-ingress test
Testing before an enclosure leaves the line. ISO 1496-1 type approval in progress.
Built to scale.
The plant is laid out for specialised enclosures and E-houses, with floor space reserved for added capacity as demand grows.

Send us a specification and we will come back with a technical response.
Application, sizing, coating grade and governing standard — the more you give us, the faster we can price it.